Underground engineering works / References /
Collector Centre 1 A, Vodičkova, Side Branch V Jámě
Complete implementation of a collector side branch, without equipment with steel constructions
DetailStrahovský Tunnel SAT 2. structure MÚK (elevated crossing) Malovanka
Relaying of sewer collector "C" with tunneling technology enabled the implementation of MÚK...
DetailWater treatment plant, water supply, sewer system and connections Kunice
Building of a water-supply and sewer system including a WTP in the municipality of Kunice
DetailCivil engineering networks for the multifunctional centre Dlouhá Míle
Complete execution of civil engineering networks for the newly constructed multifunctional centre...
DetailWater-supply line for the association of municipalities Region Jih 1. stage
Building of a water supply network of the group water supply line Region Jih
DetailFlood control measures stage 0005, Podolí, Smíchov, Výtoň
Flood control measures in the sewer network in the area of Podolí, Smíchov and Výtoň
DetailFlood control measures at Malostranská metro station
Flood protection plan – protection against penetration of water into the metro and against...
DetailGate of the feeding channel Čertovka
Building of a new closure chamber is a supplement of the Flood Protection plan for the territory...
DetailPublic sewer system Jeneč II. structure
Implementation of 2. stage of public section sewer system including the redevelopment of roads
DetailHousing complex Slunečný vršek, Košík
Implementation of water-supply and sewer systems including connections for the newly constructed...
Detail